|
Iniciar
|
|
|
|
Cercar
|
|
|
|
|
Voleu publicar les vostres licitacions a www.copca.com-dgMarket?
|
|
Cliqueu aquí:
|
|
|
|
|
|
|
|
|
• Activeu
alerta per correu electrònic
|
ENERGOATOM
|
ENERGOATOM opera a Ucraïna.
|
Anuncis d'adquisició
| Tipus d'Anunci |
Títol de l'anunci |
Data publicació |
Data límit |
|
Informació de pre-anunci
|
UA-Kiev: Tacis — solid radioactive waste treatment facility for Zaporozhye
NPP — fragmentation unit — project U1.03/06A3
|
Dec 3, 2008
|
|
|
Informació de pre-anunci
|
UA-Kiev: Tacis — solid radioactive waste treatment facility for Rovno NPP
— retrieval and sorting facility — project U1.01/06A2
|
May 9, 2008
|
|
|
Informació de pre-anunci
|
UA-Kiev: Tacis — solid radioactive waste treatment facilities at
Zaporozhye and Rovno nuclear power plants
|
Mar 27, 2008
|
|
|
Sol.licitud de Propostes
|
UA-Kiev: Tacis — radwaste treatment complex at Zaporozhye nuclear power
plant
|
Mar 13, 2008
|
Apr 4, 2008
|
|
Sol.licitud de Propostes
|
EBRD - "Develop and Implement at the NPP a System for Steam and Gas Volume
under Reactor Vessel Closure for Indirect Measurement of Heat Carrier
Level in the Reactor Vessel" (UA-Kiev)
|
Feb 28, 2008
|
Mar 5, 2008
|
|
Informació de pre-anunci
|
UA-Kiev: Tacis — radwaste treatment complex at Zaporozhye nuclear power
plant
|
Sep 28, 2007
|
Sep 18, 2008
|
|
Sol.licitud de Propostes
|
EBRD - Measure 20111 - Development and implementation of equipment and
methodology for fuel cladding failure detection by sipping method inside
the working bar of the refuelling machine during fuel assembly
transportation (UA-Kiev)
|
Aug 21, 2007
|
Oct 2, 2007
|
|
Sol.licitud de Propostes
|
EBRD - K2 R4 Post Start-Up Safety Modernisation Programme (UA-Kiev)
|
Jul 14, 2007
|
Aug 20, 2007
|
|
Sol.licitud de Propostes
|
EBRD - K2 R4 post start-up safety modernisation programme (UA-Kiev)
|
Jul 3, 2007
|
Aug 14, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Develop and Apply a Comprehensive Diagnostics System (UA-Kiev)
|
Jun 12, 2007
|
Jul 4, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Develop methodology and equipment for determining cable residual
service life (UA-Kiev)
|
May 26, 2007
|
Jul 10, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Measure 14411: 'Unit equipment with the "black box" information
storage hardware for the beyond design basis accident conditions'
(UA-Kiev)
|
May 26, 2007
|
Jul 11, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Development and implementation of equipment and methodology for
fuel cladding failure detection by sipping method inside the working bar
of the refuelling machine during fuel assembly transportation (UA-Kiev)
|
May 15, 2007
|
Jul 3, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Develop, produce and implement a set of equipment for qualitative
manufacturing and annealing of the main joint packing and equipment for
reactor main joint sealing (UA-Kiev)
|
Apr 21, 2007
|
May 29, 2007
|
|
Sol.licitud de Propostes
|
EBRD - Measure 22351: 'Replace autonomous conditioners complying with the
operation requirements' for KhNPP power unit #2 (K2) and Rovno NPP power
unit #4 (R4) (UA-Kiev)
|
Apr 12, 2007
|
May 16, 2007
|
|
Sol.licitud de Propostes
|
EBRD - diagnostic system for high voltage inputs of power transformers for
power unit number 4 of Rovno NPP (UA-Kiev)
|
Mar 30, 2007
|
May 11, 2007
|
|
Informació de pre-anunci
|
UA-Kiev: Tacis — solid radioactive waste treatment facility for Rovno
nuclear power plant
|
Feb 28, 2007
|
Feb 16, 2008
|
|
Sol.licitud de Propostes
|
EBRD - Develop, purchase and implement a complex of systems for periodic
metal inspection of Reactor Pressure Vessel from inside: with application
of ultrasonic, eddy current and television inspection methods (UA-Kiev)
|
Feb 23, 2007
|
Apr 3, 2007
|
|
Sol.licitud de Propostes
|
EBRD - To Develop and Apply a Comprehensive Diagnostics System and Primary
Pump (RCP) Vibration Monitoring and Diagnostics System (UA-Kiev)
|
Jan 18, 2007
|
Mar 6, 2007
|
|
Sol.licitud de Propostes
|
UA-Kiev: Tacis — NDT equipment and specimens for Ukrainian training and
certification centre (project U2.01/03S)
|
Nov 14, 2006
|
Dec 5, 2006
|
|
Sol.licitud de Propostes
|
UA-Kiev: Tacis — embrittlement assessment and validation of embrittlement
and re-embrittlement models for VVER reactor pressure vessels (Tareg
2.01/03) — procurement part
|
Nov 3, 2006
|
Nov 16, 2006
|
|
Sol.licitud de Propostes
|
UA-Kiev: Tacis — upgrading of reactor control and protection system (RCPS)
and neutron flux monitoring system (NFMS) electrical equipment
|
Jul 19, 2006
|
Oct 30, 2006
|
|
Informació de pre-anunci
|
UA-Kiev: Tacis — upgrading of reactor control and protection system (RCPS)
and neutron flux monitoring system (NFMS) electrical equipment — project
U1.04/05A
|
Jun 14, 2006
|
Jun 2, 2007
|
|
|
|
|
|
|